Chiller Installation for “Vishay” Factory – Dimona

Chiller Installation for “Vishay” Factory – Dimona

Chiller Installation for “Vishay” Factory – Dimona

In this project, we designed and installed systems for the Vishay factory, including the supply and installation of centrifugal water cooling unit No. 8—a 1,000-ton cooling system—in the facility’s new energy room. Additionally, we supplied and installed chilled water pumps, condenser water pumps in the cooling tower, a cooling tower fan, and filtration and dosing pumps.

All electrical and control systems were carried out by our partners at Niv Industrial Air Conditioning, ensuring optimal system integration and enhanced facility performance, with a strong emphasis on energy efficiency.

The project was completed in 2022, fully tailored to the client’s requirements and in compliance with the highest standards of the industrial cooling and air conditioning industry.

Industrial Air Conditioning Systems

Electrical & Control Systems

Project Gallery

Screw_image Contact us