In this project, we installed an advanced chiller with a cooling capacity of approximately 800 tons at the Vishay factory in Migdal HaEmek. The work included the integration of state-of-the-art industrial air conditioning systems, electrical systems, and control systems.
The project was completed in 2024, utilizing cutting-edge cooling technologies while ensuring full compliance with the highest industrial air conditioning standards.