In this project, we replaced an old freezing room at the Vishay factory in Be’er Sheva with a completely new system. The work included the integration of advanced cooling and freezing systems, smart electrical and control systems, and optimized solutions to ensure stable temperature regulation and energy-efficient consumption.
The project was completed in 2025, adhering to the strictest industrial refrigeration standards, ensuring ideal storage conditions for sensitive products.