In this project, we constructed an office building in the Omer Industrial Zone, integrating advanced industrial air conditioning, electrical, and control systems. The work included the installation of fume extraction and smoke evacuation systems, smart climate control solutions, and efficient ventilation systems to ensure a comfortable and high-quality working environment.
The project was completed in 2025, with a strong commitment to meeting the highest industry standards and utilizing cutting-edge technologies for energy efficiency and enhanced building performance.