In this project, we designed and installed advanced cooling and freezing systems for Zer Ma’adanim Catering in Be’er Sheva. The work included the integration of cutting-edge electrical and control systems, ensuring optimal temperature regulation to maintain freshness and food safety.
The project was completed in 2020, adhering to the strictest food refrigeration industry standards and utilizing state-of-the-art technologies for energy efficiency and enhanced facility performance.