In this project, we provided advanced solutions for industrial air conditioning, including the installation of state-of-the-art cooling systems and controlled climate management to create an optimal working environment for the simulator. Additionally, we carried out electrical and control system work, utilizing cutting-edge technologies to ensure maximum precision and efficiency.
The project was completed in 2021 at a confidential site for Elbit Systems and plays a key role in the operation of the advanced systems and equipment on-site.